Start a project
Tell us about your residential or commercial project through our proposal form.
Request a ProposalOur story
Our floor coating work grew out of years of porch and floor painting and basic epoxies. In this short video, Nick Williams of A.G. Williams Painting Company explains how the team learned and developed its own system for concrete floor coatings.
Watch the video
Nick walks through the basic steps every installation follows. Learn more about our floor coatings service.
If the video does not load, watch it directly on YouTube.
So, concrete floor coatings: we really got into it about six years ago at this point, having had many experiences beforehand doing some lighter work, just doing porch and floor paints or basic epoxies. So we got really into it by actually learning and developing our own systems to install concrete floor coatings.
The general process comes down to the same basic steps: grinding the floor to open up the pores and remove all of the contaminants, repairing the concrete, and putting down the coating, which is generally a three-coat system, with a base coat, the broadcast media, generally a vinyl flake, and then a clear topcoat on top of that. It’s a quick process.
Key Takeaways
Every installation follows the same proven sequence.
The floor is ground to open the pores of the concrete and remove contaminants.
Cracks and damage are repaired before any coating goes down.
A base coat goes down first, followed by a broadcast of decorative vinyl flake.
A clear topcoat seals the system. Installations generally take one to two days.
Choose the Right Path
Tell us about your residential or commercial project through our proposal form.
Request a ProposalSpeak directly with our team during weekday office hours.
Call (914) 350-5579Write to Customer Care about a general question or an existing project.
Email Customer Care